Deer Creek Pump Station

Project Type: Featured, Water & Wastewater,

Size: 3 wells 180 feet deep

Owner: Metropolitan St. Louis Sewer District

Location: St. Louis, MO

KCI Role: General Contractor

Value: $28,969,000

Delivery Method: Bid Build

Completion Date: 2022

Designer: Parsons

Construction of 1 Wet Well and 2 Dry Wells, each 180 feet deep and 36 foot diameter, inside shafts drilled and shotcreted by others, to facilitate pumping storm and sanitary flows. Dry Well and Wet Well Buildings top the 3 shafts, with associated electrical, mechanical systems and controls for a new pump station site in Shrewsbury, MO.