Header image for this page is an image of: Dcim100mediadji 0015.jpg

I-44 over BNSF Shrewsbury

Project Type: Transportation,

Owner: MoDOT

Location: Shrewsbury, MO

KCI Role: General Contractor

Value: $16,468,029

Delivery Method: Bid Build

Completion Date: 2019

Designer: TWM, Inc.

This project was originally designed as replacement of EB & WB I-44 bridges over the BNSF railway with 3-span bridges.  KCI proposed value-engineering to MoDOT and was accepted to replace each bridge with single-span bridges, saving considerable money to the owner.