Header image for this page is an image of: Dcim101mediadji 0610.jpg

Ries Road Bridge

Project Type: Transportation,

Owner: City of Ballwin

KCI Role: General Contractor

Value: $693,310

Delivery Method: Bid Build

Completion Date: 2018

Designer: CDG Engineers

KCI was contracted to remove an existing 4-cell box culvert and replace it with a 60 foot precast arch. The project included minimal sewer and asphalt/concrete paving.