St. Peters Pump Station No. 3

Project Type: Water & Wastewater,

Size: 35 feet deep

Owner: City of St. Peters, MO

Location: St. Peters, MO

KCI Role: General Contractor

Value: $2,700,000

Delivery Method: Bid Build

Completion Date: 2018

Designer: Black & Veatch

An aging pump station in Old Town St. Peters struggled to keep up with storm water that flowed to this low point in the City, so in 2016 the City designed and awarded the project to replace the pump station with a larger version. KCI shored and excavated around two-6 foot diameter concrete storm pipes, incorporated them into the next structure, and then removed sections of them so that all storm water was captured at the new station and pumped over the levee into Dardenne Creek.