St. Peters Pump Station No. 3
An aging pump station in Old Town St. Peters struggled to keep up with storm water that flowed to this low point in the City, so in 2016 the City designed and awarded the project to replace the pump station with a larger version. KCI shored and excavated around two-6 foot diameter concrete storm pipes, incorporated them into the next structure, and then removed sections of them so that all storm water was captured at the new station and pumped over the levee into Dardenne Creek.
Size: 35 feet deep
Owner: City of St. Peters
KCI Role: General Contractor
Value: $2,700,000
Delivery Method: Bid Build
Completion: September 2018
Designer: Black & Veatch