Route 67 Reconstruction
Route 67 in West Alton experienced flooding with the rise of the Mississippi River, at times shutting down the southbound lanes that would be inundated. KCI was awarded the two-year project in summer 2021 to raise these lanes approximately 10 feet in elevation and then re-align and concrete pave north and southbound Route 67, a key artery between Alton, Illinois and St. Charles County in Missouri.
Size: 1.18 miles
Owner: MoDOT
KCI Role: General Contractor
Value: $7,100,000
Delivery Method: Bid Build
Completion: September 2023
Designer: Jacobs